Second testing on the track, March 2011

After fixing some problems during the winter months, and making more decorative parts, I took the locomotive to the track last week for a second test run.

  1. Things improved:Build the water and coal container, which can be placed on the riding car.
  2. Added decorative styling around the windows and the entrance doors.
  3. Painted some more parts inside the cab, requiring a complete disassembly.
  4. Finished the cab by putting in all the nails (klinknagels).
  5. Repainted the Cab
  6. Re-assembled it all and re-tested on air.

This is the result of this second run:

Stil some items still need to be improved before the real runs at events…..

Leave a Reply

Your email address will not be published.